Time & Material
Hourly Breakdown For T&M Bids in 2024
Foreman/Troubleshooting: $150-$300
Journeyman/E-2: $125-$250
Apprentice/Helper: $90-$180
Payment Terms:
Billed weekly or at completion of project
Payment due within 30 days of invoice date
4 Hour minimum charge
Hours of Operation:
Straight time: 6am - 6pm
Time and a half: 6pm - 6am or over 8 hours onsite
Double time: over 10 hours onsite or holidays or weekends or hot work
Inclusions: The following items are included in our T&M bids:
•Labor and travel expenses required to perform the work as described in the scope.
•One hour of travel time to and from our shop to job.
•Materials we supply will have a 20% markup.
•Material, wire, and equipment will be purchased new from the supply house.
•Standard ground shipping.
•Ladders, hand tools, multi-meter, rotation meter, circuit tracer, drill bits and blades.
•We will adhere to current the State of CT laws and regulations.
•Installation and safety standards will adhere to current NFPA 70 NEC & NFPA 70E.
•Safety equipment required per current NFPA 70E.
Exclusions: The following items are NOT included in our T&M bids:
•Aerial lifts, specialty tools, temporary power, or equipment rentals.
•Permit fees.
•Projects over 30 minutes from our shop will be billed one hour travel time.
•A van fee will be added to service calls or material deliveries.
•Any applicable taxes.
•Any cost incurred by lack of material availability or shipping delays.
•Freight and delivery fees.
•Overnight, express, or expedited shipping.
•Any additional repairs that may be required outside the scope of work agreed upon.
•Any delays due to inability to access the work area.
•Any work other than that listed in the scope of work.
•If additional work is needed or scope changes, an added fee will be billed at cost.
Check out our YouTube Channel
Contact us at: 203-809-1159
Clydesdale Electrical Services
PO Box 841
Cheshire, CT 06410